Skip to main content

A Multi-Layer Cost Model for Metro/Core Networks

01 March 2013

New Image

into the market should be derived with a method to estimate the time price variation taking into account the price during the market introduction. A method to model such price variation is described in [2]. Note that all equipment including the specified transmission rates stated in this publication is bidirectional.