Skip to main content

Administration and Maintenance Plan

01 October 1969

New Image

The No. 2 Electronic Switching System has been planned with dependability, maintainability, and operational ease representing a major portion oj the total system design concept. The major characteristics that jail under these headings are redundancy, trouble detection, trouble recovery, diagnosis, repair, man-machine interface, data protection, and operational and administrative procedures for growth and change. All these jactors play a large role in both the hardware and software portions oj the system design. This article reviews the highlights in each of these areas and describes how they interact in the overall system across both the control complex and peripheral system areas.