Application of 12-channel carrier to the open-wire line between Rio de Janeiro and Satildeo Paulo
14 December 1951
Considerable detail is given on the specific problem of preparing about 200 miles of existing line and constructing about 80 miles of new line to enable the operation of four 12-channel systems within reasonable limits of noise and cross-talk. The information is prepared essentially to assist those faced by similar problems and does not involve any new techniques.