Skip to main content
Displaying 1731 - 1740 of 47506

The multiproduct uncapacitated facility location problem considers a fixed costs for opening a facility, as well as an added fixed cost for handling a particular proudct.

The multiproduct uncapacitated facility location problem (MUFLP) is a generalization of the classic uncapacitated facility problem (UFLP).

The use of oversampling and decimation for analog-to-digital converters has the advantage of requiring no precision analog components, and since most of the circuitry is digital, it benefits from t

The use of oversampling and decimation for analog-to-digital converters has the advantage of requiring no precision analog components, and since most of the circuitry is digital, it benefits from t

The use of oversampling and decimation for analog-to-digital converters has the advantage of requiring no precision analog components, and since most of the circuitry is digital, it benefits from t

A Wilkinson power divider,operating not only at one frequency f(0), but also at its first harmonic 2f(0) is presented.

A dual-polarization model of Rayleigh backscattering for telecom fibers is developed.

A 10 Mbaud waveshaping and current-mode line driver for 10Base-T and a 125 Mbaud current-mode line driver for 100Base-TX/FX dual-speed transmitter for a Fast Ethernet transceiver chip are presented

The order acceptance process is an important interface between a manufacturer and its customers.

No Abstract. Refer back to previously released 091785.

Explore more

Video

Nokia Bell Labs celebrates 100 years of innovation